Check current approval
Open the campaign and refresh it. A project is eligible when its current storyboard revision has an approved review. The delivery also checks that the supplied publishing-copy revision has not changed.
Choose the contents
Select up to twelve projects, enter the recipient label and note, and optionally include the references shared in those approved rounds. The current technical limit is twenty-four files and fifty megabytes of reference bytes per package.
Inspect and deliver
The ZIP contains a manifest, HTML and JSON storyboards, SRT subtitles and selected files. Publishing copy and delivery notes are separately identified as team-supplied. Copy the private link when it is first shown.
Manage the history
Expiry or revocation stops client access; permitted team members can still read private history. Later edits do not rewrite a packet. Global project unsharing or deletion removes complete packets containing that project. Previously downloaded files cannot be recalled.
Put this stage in context.
Follow the fictional example or return to the feature overview, then open the real workspace when you are ready.
Try this stage in the sample Explore the related featureThe current workspace is a preview. Video generation and checkout remain simulated.